Page 1 of 5
Journal for Studies in Management and Planning
Available at
http://edupediapublications.org/journals/index.php/JSMaP/
ISSN: 2395-0463
Volume 03 Issue 10
September 2017
Available online: http://edupediapublications.org/journals/index.php/JSMaP/ P a g e | 322
Traffic Management by using GIS
Marapaka Laxminarayana
M.Sc.Geoinformatics Telangana University
Abstract-The trend of urbanization, population increase and the increase in nu mber of registered
vehicles induces pressure on tra ffic movements and makes living in urban area more difficult.
General congestion related data collection and congestion management measure is labor
intensive and a heavy investment is needed for these mitigation measures. La test technologies
like GIS will help to analyze th e live traffic situation and suggest the cost effective measures to
mitigate the congestion. This report briefly present the traffic problems (In the different
intersections in Mumbai), there causes and possible solutions to ensure free flo w of traffic. The
project attempts to quantify the intersection of huge traffic congestion and accidental damage.
Expected project output will be the recommendation for better traffic management using GIS tool
on the basis of data collected, analysis and design. GIS is effectively used for data collecting,
data analyzing and result displaying process.
Keywords-Vehicle count, Rotary, Congestion Management, GIS Application, M odeling.
I. INTRODUCTION
India is the second most populou s
country in the world and a fast growing
country. It is estimated that over 6
million people trav el on road daily in
Mumbai city. According to world health
organization (WHO), road traffic
accidents are responsible for leading
cause of death. The total number of
accidents recorded in India for year 2007
is 479.2 thousands and number of
persons killed is 114.4 thousands, out of
this Mumbai recorded 18.5% of the total
accidents in the country. In year 2008,
the total number of reported accidents in
Mumbai was 30,242 out of which 621
were fatal.
The total number of motor vehicles in
Mumbai and its suburbs has touched the
figure of 18.73 lakh, which is about 11%
of the total motor vehicles registered in
the state. The latest economic survey of
Maharashtra tabled in the state
legislature on Tuesday revealed that as
of January 1, 2011, the number of
vehicles registered in Maharashtra was
170.30 lakh, wh ich means about 15,200
vehicles per lakh population. (Source
DNA)
Table.1 growths of vehicles in Mumbai city (Source: MCGM)
Year Growth of total
vehicles in lacs
1971 1.52
1981 3.09
1991 6.23
2001 10.30
Fig.1Accident Data during 2010 to 2011 (Source: By SRUT) 2011 16.00
Page 2 of 5
Journal for Studies in Management and Planning
Available at
http://edupediapublications.org/journals/index.php/JSMaP/
ISSN: 2395-0463
Volume 03 Issue 10
September 2017
Available online: http://edupediapublications.org/journals/index.php/JSMaP/ P a g e | 323
Increasing traffic congestion creates
lots of stresses on traffic department
of Mumbai; most of the time traffic
congestion and hence overall
management get collapsed. For
inventing and implementing new
solution on such problems it is
necessary to get current traffic data
and right decision making tool. GIS
is one of the management decision
making tool which analyses stores
huge amount of data efficiently and
effectively. Expected project output
will be the recommendation for
better traffic management using GIS
tool on the basis of data collected,
analysis and design.
II. LITERATURE REVIEW
The literatures review was done to
find the various key parameters of
congestion at traffic rotary, existing
methodologies that were adopted
for congestion modelling and the
existing GIS application in the area
of management.
III. M
ETHODO
LOGY
AND
STUDY
AREA The
methodolog
y adopted
for the
study is:
1. Identification of parameters which affect
traffic congestion.
2. Selection of study corridor.
3. Collection of data.
4. Design and analysis
5. Application of GIS for traffic
management.
IV. DATA COLLECTION
Using Manual counters: It is the
most traditional method. In this case
trained observers gather traffic data
that cannot be efficiently obtained
through automated counts e.g.
vehicle occupancy rate, pedestrians
and vehicle classifications. The most
common equipment used are tally
sheet, mechanical count boards and
electronic count board systems.
Table.2 growths of vehicles in Mumbai city
1.Kasheli To Bhiwandi
Day Day Vehicles Night Vehicles Total Vehicles
Right Straig Left Day Right Straight Left Night per per
ht Total Total Hr min
Day 1 17902 18726 0 36628 7474 7855 0 15329 51957 2165 36
Day 2 19204 17497 0 36701 6568 8108 0 14676 51377 2141 36
Day 3 18663 17880 302 36845 8200 8586 126 16912 53757 2240 37
Range 51-52% 49% 0.5- 36725 47- 50-52% 0- 15639 2182 36
1% 48% 1%
2.Mankoli To Anjur Chowk
Date Day Vehicles Night Vehicles Total Vehicles
Page 3 of 5
Journal for Studies in Management and Planning
Available at
http://edupediapublications.org/journals/index.php/JSMaP/
ISSN: 2395-0463
Volume 03 Issue 10
September 2017
Available online: http://edupediapublications.org/journals/index.php/JSMaP/ P a g e | 324
Right Straig Left Day Right Straight Left Night per per
ht Total Total Hr min
Day 1 22624 0 2417 46803 3263 12 4076 7351 54154 2256 38
9
Day 2 21914 0 2356 45477 3176 11 3516 6703 52180 2174 36
3
Day 3 21977 0 2383 45815 3248 15 3847 7110 52925 2205 37
8
Range 47-49% 0 51- 46032 44- 0 52- 7055 2212 37
53% 46% 56%
3.Bhiwandi To Kasheli
Date Day Vehicles Night Vehicles Total Vehicles
Right Straig Left Day Right Straight Left Night per per
ht Total Total Hr. min
Day 2 0 18162 8282 26444 0 5476 2725 8201 34645 1444 24
Day 3 0 17809 8116 25925 0 5858 2598 8456 34381 1433 24
Range 0 68- 31- 26185 0 66-70% 30- 8329 1438 24
69% 32% 34%
V. DESIGN AND ANALYSIS
According to IRC-65-1976 Recommended practice for traffic Rotaries following design steps
are carried out to find out the dimensions of the rotary parameters and capacities of the rotary at
Anjur chowk T point.
Table.3 Design Steps for Rotary at Anjur chowk T point
Sr No. Design elements Dimension Remark
1 Design speed:- The normal practice
is to keep the design speed as 30
and 40 kmph for urban and rural
areas respectively.
2 Entry, exit and island radius
Entry Radius (In m) 20 30kmph is the speed generally
suitable for urban area according to
IRC-65-1976
Exit Radius (In m) 40 Kept about 1.5 to 2 times the entry
curve according to IRC-65-1976
Radius of central Island (In m) 26.6 1.33 times the radius of the Entry
curve is generally suggested
3 Weaving length (In m) 54 minimum weaving length for
30kmph
e1=Width of carriage way at the 10 (6 lanes ) according to table 2 of
entry (In m) IRC-65-1976
@IJMTER-2015,All rights Reserved 835
